****ALERTS**** > Oil Boiler Work(update#2)
Oil Boiler Work(update#2)
Front Entrance -- Aug 11, 2004 -- As you are aware a new oil line (with an environmental protective shield) was installed near the front parking lot entrance.  The dug up trench area will be paved over after the soil has been allowed to settle.  This may take several days.  Please use caution when walking or driving on this area as the pavement to soil line (over the trench) can be tricky with bumps especially if it rains.  Thank you.